This article provides information on how to build reports using IT Managed datasets (semantic models).
Detailed Information
- Power BI Desktop and create a new report. Select "Power BI semantic models" from the “Get Data” menu. Be sure to click on the drop-down arrow, not on the icon above it.

- Choose the Power BI would like to use and design your report. To verify which are using, you can see the name of the are using on the bottom right corner of your screen.

- Apply Row Level Security if needed. See Row Level Security in Power BI page for more information.
-
Save as PBIX/PBIT file to the Document Library in your department's folder in the UMS Power BI HUB SharePoint Library.
- Publish the report to the workspace in Power BI Service. Perform additional Row Level Security Testing. "Test As Roles" feature only works if the report and the in the same workspace.

-
Now you have Power BI reports that do not use their own , but rather use a shared semantic model from the IT-managed workspace. This can be easily seen in Power BI Service with a lineage view.

Environment